Al- Dayir Water Station

The project is a full water station in the village that includes:1-  Well drilling 850 feet…

محطة مياه الداير

Status

Sector

Location

Start date

Budget

The project is a full water station in the village that includes:

1-  Well drilling 850 feet deep.

2-  Provision and installation of steel Elevated Tank with the size of 10,000 Gallon.

3-  Provision and installation of (Hybrid Pumping System (Solar & Diesel Unites )  & the Submersible pump.

4-  Fencing & Internal distribution network ( Animal basin and Karo hose and human drinking tabs).