The project is a full water station in the village that includes:
1- Well drilling 200 feet deep.
2- Provision and installation of steel Elevated Tank with size of 10,000 Gallon.
3- Provision and installation of (Hybrid pumping System (Solar & Diesel Unites ) & the Submersible pump.
4- Fencing & Internal distribution network ( Animal basin and Karo hose and human drinking tabs).

