The project is a full water station in the village that includes:
- Drilling of an underground well 700 feet deep.
- Installing a 24 m3 GRP water tank on a 6 -meter high iron rack
- Installing a solar water pumping system.
- Fencing and stripes for the station
The number of project beneficiaries is about 8000 residents, in addition to livestock.

