The project is complimentary of a water station in the village that includes:
- Installing a 24 m3 GRP water tank on a 6 meter high iron rack.
- Installing a solar water pumping system (submersible pump, solar energy panels with a support structure and a control switch).
- Fencing and drinking stripes for the station
The number of project beneficiaries is about 7000 residents, in addition to livestock.
Estimated cost:5,600,000 Sudanese pounds



