Groundwater station (drilling a 500-foot well + GRP tank with a capacity of 24 cubic meters + man and animal strips + fencing of the station).
The objective of the project: to provide water for the residents of the village of Al-Areef Al-Ananin 3500 and the neighboring villages + the stability of the residents.

