The project is a water transmission line from the River Nile to the village with a length of 4.5 km and a central distribution station (ground tank + 2 upper + pumping station) with full supplements and an internal network of 3 km long.
Status
Sector
Location
Start date
Budget
The project is a water transmission line from the River Nile to the village with a length of 4.5 km and a central distribution station (ground tank + 2 upper + pumping station) with full supplements and an internal network of 3 km long.