Completed Project

Abu Daqees Water Station

Project Components: Drilling a 500-foot-deep water well Installation of a solar-powered water pumping system, including a…

محطة مياه ابو دقيس

Status

completed

Sector

WASH

Location

Sudan

Date

2021

Budget

Project Components:

  • Drilling a 500-foot-deep water well
  • Installation of a solar-powered water pumping system, including a submersible pump, solar panels with a supporting structure, and a control switch to operate the station and provide a reliable water supply
  • Installation of a 12 m³ water tank on a 6-meter-high tower
  • Fencing the water station with a metal fence and constructing drinking troughs for people and livestock

The water station will serve approximately 5,400 people.