Al-Jabriya Village Water Line Transmission Project 2020

The project is a water transmission line from the River Nile to the village with a…

مشروع خط ناقل مياه قرية الجابرية 2020

Status

Sector

Location

Start date

Budget

The project is a water transmission line from the River Nile to the village with a length of 4.5 km and a central distribution station (ground tank + 2 upper + pumping station) with full supplements and an internal network of 3 km long.