Completed Project

Al-Jabriya Village Water Line Transmission Project 2020

The project is a water transmission line from the River Nile to the village with a…

مشروع خط ناقل مياه قرية الجابرية 2020

Status

completed

Sector

WASH

Location

Sudan

Start date

2020

Budget

The project is a water transmission line from the River Nile to the village with a length of 4.5 km and a central distribution station (ground tank + 2 upper + pumping station) with full supplements and an internal network of 3 km long.