The project is a water station in the village that includes:
- Drilling of an underground well 600 feet deep
- Installing a 12 m3 GRP water tank on a 6 -meter high iron rack
- Installing a solar water pumping system.
- Fencing and stripes for the station
The number of project beneficiaries is about 3000 residents, in addition to livestock.
Estimated cost: 10,400,000 Sudanese pounds

