The project is a complementation of a water station in the village that includes:
- Installing a 12 m3 GRP water tank on a 6 -meter high iron rack
- Installing a solar water pumping system.
- Fencing and stripes for the station
The number of project beneficiaries is about 4000 residents, in addition to livestock.

