Mesiktab Village Water Transmission Line

The project consists of supplying, drilling, and installing a water transmission line in the village with…

مشروع خط ناقل مياه قري المسكتاب

Status

Sector

Location

Start date

Budget

The project consists of supplying, drilling, and installing a water transmission line in the village with a total length of 5856 meters distributed between 8 inches and 6 inches and 4 inches, to distribute within the existing stations, more than 7 stations can be linked to the transmission line and the internal network and the work of a central station that contains a ground and upper tank, pumping units and a tracking system.

 The project's goal: 

Provide water for the residents of Al-Maskitab village north and to sustain the water. The number of the beneficiaries of the project is about 2100 families, or about 12,000 people, for the villages of Al-Maskitab, and the Animal wealth estimated at more than 2000 heads.