The project consists of supplying, drilling, and installing a water transmission line in the village with a total length of 5856 meters distributed between 8 inches and 6 inches and 4 inches, to distribute within the existing stations, more than 7 stations can be linked to the transmission line and the internal network and the work of a central station that contains a ground and upper tank, pumping units and a tracking system.

 The project's goal: 

Provide water for the residents of Al-Maskitab village north and to sustain the water. The number of the beneficiaries of the project is about 2100 families, or about 12,000 people, for the villages of Al-Maskitab, and the Animal wealth estimated at more than 2000 heads.

Stay up to date with the latest news.

Related Posts...

ﻣﺤﻄﺔ ﻣﻴﺎﻩ ﺍﻟﻌﺪﺍر

Al-Adar Water Station

The village of Al-Adar is located in the town of Tendalti, in the state of White Nile, the objective of the project is to reduce the operating cost by changing the operating system from diesel to solar The station's included the installation of the solar energy...

محطة مياه قرية فجيد

Fajid village Water Station

The project is a complete water station in the village. Sadagaat Charity Organization drilled a 500-meter deep underground well and installed a solar water pumping system (submersible pump and solar panels with a support structure and control switch). In addition...