by Anood | Jul 16, 2026 | Completed WASH, Sadagaat Projects, WASH Projects
The project is a complete water station in the village. Sadagaat Charity Organization has drilled a 220-feet deep well and installed a solar water pumping system (submersible pump and solar panels with a support structure and control switch). In addition to installing an iron water tank of 25 cubic meters on an iron stand, 6 meters in height.
The number of beneficiaries of the project is about 5,000 civilians of the village in addition to an animal wealth estimated at 4000 heads of various types of livestock.
And it was implemented by contractors specializing in drilling, tanks installation, and solar energy systems.
by Anood | Jul 16, 2026 | Completed WASH, Health Projects, Sadagaat Projects
Sadagaat organization works in coordination with the National Voluntary Blood Donation Program to establish periodic campaigns in companies, institutions, and public places to spread the culture of voluntary blood donation and to provide safe, screened blood products to all groups in need of blood.
Sadagaat Organization contributed to filling the need for blood at the Central Blood Bank, especially during the second quarter of the year (April, May, June) by implementing 84 voluntary blood donation campaigns in 2019.
In addition to voluntary blood donation campaigns, the organization committed to maintaining 8 vehicles for voluntary blood donation (5 of which were maintained in partnership with Sudani Telecom).
Arak Food Group contributed to supporting the implementation of blood donation campaigns by making in-kind donations represented in a refrigerator and 3,500 juice bottles. The organization also purchased 2880 juice bottles to support the implementation of the voluntary donation inside the Central Blood Bank.
62 events within the campaign “from our blood for our country”, which is an annual campaign organized in timing with the Independence Day in partnership with the Central Blood Bank and a number of organizations and initiatives in Khartoum and the other states to provide a stock of blood for all groups. In its sixth edition, the campaign included 12 states and 55 cities, with the participation of 74 partner organizations / voluntary initiatives in Khartoum and the states. The campaign succeeded in providing a total of 2,643 blood bottles.
by Anood | Jul 16, 2026 | Completed WASH, Health Projects, Sadagaat Projects
In cooperation with the Sudanese platform to confront Corona and the coalition of Sudanese organizations against Corona, 7,500 testing kits been imported from Canada to support the FMOH efforts on increasing the testing capacity in the country and open more Labs to conduct the test.
by Anood | Jul 16, 2026 | Completed WASH, Sadagaat Projects, WASH Projects
The project is a complete water station in the area. Sadagaat Charity Organization has drilled a 680 deep underground well and installed a solar water pumping system (submersible pump and solar panels with a support structure and control switch). In addition to installing a 24 cubic meter GRP water tank on an iron stand with a height of 6 meters and the work of building a complete fence for the station and a well-operating system.
The number of beneficiaries of the project is about 9000 residents of the region and an additional number of residents of neighboring areas more than 8000 beneficiaries.
by Anood | Jul 16, 2026 | Completed WASH, Health Projects, Sadagaat Projects
Sadagaat Charity Organization works to provide the monthly needs of food supplies and distribute them to the three Shelters which are 150 residents, as follows: –
• Shishir Shelter for the Rehabilitation of Children with Mobility Disabilities,80 beneficiaries (January – March).
• Al-Nour institute for 40 visually disabled students.
• Cancer facility for children (Tadae’e),30 beneficiaries.
The total cost of the requirements for the shelters reached 233,007 SDG during the year 2019.
by Anood | Jul 16, 2026 | Completed WASH, Sadagaat Projects, WASH Projects
The project is a water station in the village. Sadagaat Charity Organization is completing the well of the water station by installing a solar water pumping system (submersible pump and solar panels with a support structure and a control switch). In addition to installing a 24 cubic meter GRP water tank on an iron stand of 6 meters height.
The number of beneficiaries of the project is about 4,800 families, that is, about 28,800 people for the Um Ash Al-Sheikh village and the neighboring villages (Um Ash Al-Soug / Um Ash Al-Suryat / Um Dardima / Abi / Gury).
Animal stock is estimated at more than 9000 heads.
The total cost of the project amounted to 1,791,550 (million, seven hundred and ninety-one thousand five hundred and fifty Sudanese pounds only) including all components of the project. The implementation was carried out by contractors specializing in tanks and solar energy systems.
Date: 2020