Al Maqam Water Station

Al Maqam Water Station

Located 45 km east of Sennar, the village is home to approximately 15,000 people, five schools, and a large livestock population. However, the community currently relies on only two water wells, which are insufficient to meet the needs of the people and their livestock.

We invite you to join us in supporting the drilling of a new water well to meet the community’s needs and extend access to neighboring villages.

Total cost of drilling the well: SDG 14,500,000

Donations can be made through:

  • Bank of Khartoum: 1290129
  • Fawry: 12300123
  • Abu Dhabi Islamic Bank: 891624
  • Al Salam Bank: 305250
Faqousa Water Station

Faqousa Water Station

The project involves completing the village water station and includes:

  • Installation of a 24 m³ GRP water tank on a 6-meter-high steel tower
  • Installation of a solar-powered water pumping system, including a submersible pump, solar panels with a supporting structure, and a control switch
  • Fencing of the water station and installation of drinking troughs for people and livestock

The project is expected to benefit approximately 10,000 people in the village, in addition to supporting the local livestock population.

Khazan Jadeed Water Station

Khazan Jadeed Water Station

Project Components:

  • Drilling a 500-foot-deep water well
  • Installation of a solar-powered water pumping system, including a submersible pump, solar panels with a supporting structure, and a control switch to operate the station and provide a reliable water supply
  • Installation of a 12 m³ water tank on a 6-meter-high tower
  • Fencing the water station with a metal fence and constructing drinking troughs for both people and livestock

The water station will serve approximately 5,000 people, in addition to providing water for livestock.

Al foola Water Station

Al foola Water Station

The project involves establishing a water station in the village and includes:

  • Installation of a 12 m³ GRP water tank on a 6-meter-high steel tower
  • Installation of a solar-powered water pumping system, including a submersible pump, solar panels with a supporting structure, and a control switch
  • Fencing of the water station and installation of livestock watering troughs

The project is expected to benefit approximately 3,600 people in the village, in addition to supporting the local livestock population.

Abu Rkba Water Station

Abu Rkba Water Station

The project involves completing the village water station and includes:

  • Installation of a solar-powered water pumping system, including a submersible pump, solar panels with a supporting structure, and a control switch
  • Fencing of the water station and installation of livestock watering troughs

The project is expected to benefit approximately 7,000 people in the village, in addition to supporting the local livestock population.

Wad Joodat Water Station

Wad Joodat Water Station

Groundwater station (drilling a 500-foot well + GRP tank with a capacity of 24 cubic meters + man and animal strips + fencing of the station). 

The objective of the project: to provide water for the residents of the village of Al-Areef Al-Ananin 3500 and the neighboring villages + the stability of the residents.