by Anood | Jul 20, 2021 | Sadagaat Projects, WASH Projects
Groundwater station (drilling a 500-foot well + GRP tank with a capacity of 24 cubic meters + man and animal strips + fencing of the station).
The objective of the project: to provide water for the residents of the village of Al-Areef Al-Ananin 3500 and the neighboring villages + the stability of the residents.
by Anood | Jul 18, 2021 | Sadagaat Projects, WASH Projects
The project is a full water station in the village that includes:
1- Well drilling 850 feet deep.
2- Provision and installation of steel Elevated Tank with the size of 10,000 Gallon.
3- Provision and installation of (Hybrid Pumping System (Solar & Diesel Unites ) & the Submersible pump.
4- Fencing & Internal distribution network ( Animal basin and Karo hose and human drinking tabs).
by Anood | Jul 16, 2021 | Sadagaat Projects, WASH Projects
The project is a full water station in the village that includes:
1- Well drilling 520 feet deep.
2- Provision and installation of steel Elevated Tank with size of 10,000 Gallon.
3- Provision and installation of (Hybrid pumping System (Solar & Diesel Unites ) & the Submersible pump.
4- Fencing & Internal distribution network ( Animal basin and Karo hose and human drinking tabs).
by Anood | Jul 16, 2021 | Sadagaat Projects, WASH Projects
The project is a full water station in the village that includes:
1- Well drilling 100 feet deep.
2- Provision and installation of steel Elevated Tank with size of 10,000 Gallon.
3- Provision and installation of (Hybrid pumping System (Solar & Diesel Unites ) & the Submersible pump.
4- Fencing & Internal distribution network ( Animal basin and Karo hose and human drinking tabs).
by Anood | Jul 16, 2021 | Sadagaat Projects, WASH Projects
The project is a full water station in the village that includes:
- Drilling of an underground well 700 feet deep.
- Installing a 24 m3 GRP water tank on a 6 -meter high iron rack
- Installing a solar water pumping system.
- Fencing and stripes for the station
The number of project beneficiaries is about 8000 residents, in addition to livestock.
by Anood | Jul 16, 2021 | Sadagaat Projects, WASH Projects
The project is a complementation of a water station in the village that includes:
- Installing a 12 m3 GRP water tank on a 6 -meter high iron rack
- Installing a solar water pumping system.
- Fencing and stripes for the station
The number of project beneficiaries is about 4000 residents, in addition to livestock.