Fttabrnu Water Station

Fttabrnu Water Station

The project is a full water station in the village that includes:

1-  Well drilling 200 feet deep.

2-  Provision and installation of steel Elevated Tank with size of 10,000 Gallon.

3-  Provision and installation of (Hybrid pumping System (Solar & Diesel Unites )  & the Submersible pump.

4-  Fencing & Internal distribution network ( Animal basin and Karo hose and human drinking tabs).

Zakat Al-Fitr 2022

Zakat Al-Fitr 2022


Sadagaat Charity Organization distributed approximately 170,000 kg of flour as part of its Zakat Al-Fitr project, providing Zakat Al-Fitr in the form of a staple food commonly consumed by the local community. The distribution benefited around 17,000 vulnerable and underprivileged families, helping support their basic needs during Eid Al-Fitr.




Rehabilitation of Bashayer Hospital Blood Bank

Rehabilitation of Bashayer Hospital Blood Bank

The Blood Bank at Bashayer Hospital needs a complete rehabilitation that includes the maintenance of the building and the provision of medical devices necessary for the safety and quality of blood products and its derivatives (plasma and platelets) that save patients with cancer, hemophilia, people with traffic accidents, women in childbirth and those with rare blood tyoes, this is an invitation to every community to cooperate hand in hand Let’s revive this building on which the lives of thousands of patients depend on.

Cost: $ 70,000

 We receive donations on the following accounts:

Bank of Khartoum: 1290129

Faisal: 12300123

Abu Dhabi: 891624

Al-Salam: 305250

Ramadan Food Packages 2022

Ramadan Food Packages 2022

With the support of Sadagaat communities inside and outside Sudan

The 2022 Ramadan Bags Distribution Project has been completed, benefiting 14,812 families from vulnerable and underprivileged households in Khartoum State

Total cost: SDG 400,026,441

Um Skina Water Station

Um Skina Water Station

The project is complimentary of a water station in the village that includes:

  • Installing a solar water pumping system (submersible pump, solar energy panels with a support structure and a control switch).
  • Fencing and drinking stripes for the station

The number of project beneficiaries is about 3000 residents, in addition to livestock.

Estimated cost:3,350,000 Sudanese pounds

Al Dawa’ab Water Station

Al Dawa’ab Water Station

The project is a complimentary of a water station in the village that includes:

  • Installing a 24 m3 GRP water tank on a 6 meter high iron rack.
  • Installing an electric water pumping system.
  • Fencing and stripes for the station

The number of project beneficiaries is about 4000 residents, in addition to livestock.