The project is a water station in the village. Sadagaat Charity Organization completed the well of the water station by installing a solar water pumping system (submersible pump and solar panels with a support structure and a control switch). In addition to maintaining the existing tank and fencing the station.
The number of beneficiaries of the project is about 3000 beneficiaries in the village and more than 3000 beneficiaries in the neighboring villages as well as the animal wealth estimated at more than 2000 heads.
The implementation was carried out by contractors specializing in tanks and solar energy systems.
The project is the completion of a village water station and an internal network. Sadagaat Charity Organization installed a solar water pumping system (submersible pump and solar panels with a support structure and a control switch).
In addition to the village’s internal water network, with 4-inch diameter HDPE pipes, with a total length of 350 meters.
The number of beneficiaries of the project is about 2,400 residents of the village in addition to an animal wealth estimated at 2,000 heads of various types of livestock.
The implementation was carried out by contractors specialized in solar energy systems and transmission lines.
The project is a complete water station in the village. Sadagaat Charity Organization has drilled a 650-meter deep underground well and installed a solar water pumping system (submersible pump and solar panels with a support structure and control switch). In addition to installing a 24 cubic meter GRP water tank on an iron stand with 6 meters height.
The number of beneficiaries of the project is about 5400 residents of the village in addition to animal wealth estimated by 2,000 heads of various types of livestock.
And it was implemented by contractors specialized in drilling, reservoirs, and solar energy systems.
Groundwater station (GRP tank with a capacity of 24 cubic meters + solar energy unit to run the plant + man and animal strips + fencing the station).
Providing water for the inhabitants of the village of Katraya 7,000 people and the neighboring villages.
The project is a water transmission line from the River Nile to the village with a length of 4.5 km and a central distribution station (ground tank + 2 upper + pumping station) with full supplements and an internal network of 3 km long.