Nashrbo Village Water Station

Nashrbo Village Water Station

The project is a complete water station in the village. Sadagaat Charity Organization drilled a 500-meter deep underground well and installed a solar water pumping system (submersible pump and solar panels with a support structure and control switch). 

In addition to installing a 24 cubic meter GRP water tank on an iron stand of 6 meters height. 

The number of beneficiaries of the project is about 9200 residents of the village in addition to an animal wealth estimated at 6000 heads of various types of livestock.

 

AlNakhiel Water Station (Dar Al Salam Square 81) Hameshkoreb

AlNakhiel Water Station (Dar Al Salam Square 81) Hameshkoreb

The project is a complete water station in the area. Sadagaat Charity Organization has drilled a 610 depth underground well and installed a solar water pumping system (submersible pump and solar panels with a support structure and control switch).

 In addition to installing a 24 cubic meter GRP water tank on an iron stand with a height of 6 meters and building a complete fence for the station and a well-operating system. 

The number of beneficiaries of the project is about 11,000 residents of the area and an additional number of residents of the neighboring areas of more than 5,000 families. 

 The implementation was carried out by contractors specialized in drilling, tank, and solar energy systems.

Al-Eskan 9 Village (New Halfa) Water Station

Al-Eskan 9 Village (New Halfa) Water Station

The project is a tank for a water station in the village. Sadagaat Charity Organization supplied and installed a 24 cubic meter GRP water tank on an iron stand, 6 meters high, with a reinforced concrete pipe. 

The number of beneficiaries of the project is about 2000 civilians in addition to an animal wealth estimated at 500 heads of various types of livestock.

 The implementation was carried out by contractors specializing in tanks installation and civil works – 2020.

Um Zakra Water Station

Um Zakra Water Station

The project is complimentary of a water station in the village that includes:

  • Installing a solar water pumping system (submersible pump, solar energy panels with a support structure and a control switch).
  • Fencing and stripes for the station

The number of project beneficiaries is about 25000 residents, in addition to livestock.

Estimated cost:3,200,000 Sudanese pounds